《Table 6 Main tasks of the science ground segment》
本系列图表出处文件名:随高清版一同展现
《The enhanced X-ray Timing and Polarimetry mission—eXTP》
The OGS comprises the mission operation center(MOC)and the two main ground stations for the telemetry reception,i.e.,the Sanya(China)and Malindi(Europe)ground stations.Both stations will be equipped with X-band receivers and transmitters.The MOC will be based at NSSC,CAS,and will be in charge of receiving the instrument telemetry,together with all relevant auxiliary files(e.g.,house-keeping files).All of this data will be decoded and processed to a manageable level 0 format(typically FITS)by the MOC before making them available to the SGS for further processing,quick-look activites,archiving,and distribution.The MOC will also be in charge of translating the mission observational program provided by the SGS into specific telecommands to be delivered to the TT&C for uplink in a transparent mode.The tasks of the main eXTP ground segment parts are shown in Table 6.
图表编号 | XD0034876500 严禁用于非法目的 |
---|---|
绘制时间 | 2019.02.01 |
作者 | ShuangNan Zhang、Andrea Santangelo、Marco Feroci、YuPeng Xu、FangJun Lu、Yong Chen、Hua Feng、Shu Zhang、Sren Brandt、Margarita Hernanz、Luca Baldini、Enrico Bozzo、Riccardo Campana、Alessandra De Rosa、YongWei Dong、Yuri Evangelista、Vladimir Karas、Norbert Meidinger、Ali |
绘制单位 | Key Laboratory for Particle Astrophysics, Institute of High Energy Physics, Chinese Academy of Sciences、Key Laboratory for Particle Astrophysics, Institute of High Energy Physics, Chinese Academy of Sciences、Institut für Astronomie und Astrophysik, Eberha |
更多格式 | 高清、无水印(增值服务) |