With reference to the current water diversion projects in China,the water diversion flow discharge is set to 40 m3/s.Five connectivity schemes with different water transfer routes were formulated to evaluate the water transfer project’s impact on the hydrodynamics and water quality of the Tangxun Lake group(Table 3).
图表编号 | XD0047167200 严禁用于非法目的 |
---|---|
绘制时间 | 2019.03.01 |
作者 | 杨卫、张利平、张艳军、李宗礼、肖宜、夏军 |
绘制单位 | State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University、Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute、State Key Laboratory of Water Resources and Hydropower Engineering Science, W |