《Table 7 Comprehensive evaluation results of the five schemes》
提示:宽带有限、当前游客访问压缩模式
本系列图表出处文件名:随高清版一同展现
《一种河湖水系连通方案的综合评估方法——以汤逊湖湖泊群为例(英文)》
It can be seen from the evaluation results(Table 7)that the lakes under Scheme V have the largest mean flow velocity and the lowest stagnant water ratio.In addition,the lakes under Scheme V have the largest water quality improvement rate and the largest concentration change index.As for the aspect of the socio-economic indexes,it is still Scheme V that can bring the most net benefits.Moreover,Scheme V can improve both the hydrodynamic condition and the water quality condition of the six lakes simultaneously by diverting water from the Donghu Lake and the Liangzi Lake.In summary,Scheme V is chosen as the optimal scheme.
图表编号 | XD0047167400 严禁用于非法目的 |
---|---|
绘制时间 | 2019.03.01 |
作者 | 杨卫、张利平、张艳军、李宗礼、肖宜、夏军 |
绘制单位 | State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University、Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute、State Key Laboratory of Water Resources and Hydropower Engineering Science, W |
更多格式 | 高清、无水印(增值服务) |
查看“Table 7 Comprehensive evaluation results of the five schemes”的人还看了
- 表4 地铁1号线沿线地面沉降危险性综合评价结果Tab 4 The risk comprehensive evaluation results of land subsidence along Metro Line 1
- 表5 地铁2号沿线地面沉降危险性综合评价结果Tab 5 The risk comprehensive evaluation results of land subsidence along Metro Line 2