《Table 2The parameters of USC unit in simulation》
提示:宽带有限、当前游客访问压缩模式
本系列图表出处文件名:随高清版一同展现
《Steam Pressure Control of 1000 MW Ultra-Supercritical Coal-Fired Power Unit Based on Multi-Model Predictive Control》
The parameters of USC unit in the simulation are listed in Table 2[16].The static parameters are not changing with the load conditions.The dynamic parameters,on the other hand,are changing with load condition.The static parameters describe the static relationships between the boiler and turbine,and the dynamic parameters describe the dynamic relationships described in Eqs.(1—11).
图表编号 | XD0042858500 严禁用于非法目的 |
---|---|
绘制时间 | 2019.02.01 |
作者 | 王国良、丁宝苍、阎威武 |
绘制单位 | School of Electronic and Electrical Engineering, Shanghai University of Engineering Science、School of Electronic and Information Engineering, Xi'an Jiaotong University、Department of Automation, Shanghai Jiao Tong University |
更多格式 | 高清、无水印(增值服务) |