《基于电蓄热与抽水蓄能的风电消纳协调控制策略(英文)》
In order to verify the feasibility and effectiveness of the coordinated control strategy based on electric heat storage and pumped storage,taking the wind farm of Jiuquan new energy base in Gansu as an example,the simulation was carried out.The installed capacity of the wind farm is 300 MW,and its prediction is shown in Table 2.The prediction of electric load and thermal load is shown in Table 3.The parameters of pumped storage unit are shown in Table 4.The parameters of thermal power unit are shown in Table 5.The parameters of cogeneration unit are shown in Table 6.The dispatch cycle is 1d,and 1h is a dispatch period.