《A Fuzzy Logic-Based Method for Risk Assessment of Bridges during Construction》


  1. 获取 高清版本忘记账户?点击这里登录
  1. 下载图表忘记账户?点击这里登录

Then the FAHP method on the basis of a 3-point scale described in Section 3 w as used to perform risk identification and risk ranking of this bridge.The details are not displayed in this paper.The results show n in Tables 3-5 present the w eight vectors and ranking of risk factors.It can be seen from Tables 3-5 that 1) anchor construction risk is the most important risk factor in risk group B,quality risk is the most important risk factor in risk group C,and drainage measures has the highest priority value in group D;2) the 3-point scale in the adopted FAHP method is practicaltocompletethecomprehensiverisk identification and ranking of bridges during construction.