《Table 5We ight ve ctors and ranking of pairwise comparison matrixe s for risk group D base d on the
本系列图表出处文件名:随高清版一同展现
《A Fuzzy Logic-Based Method for Risk Assessment of Bridges during Construction》
Then the FAHP method on the basis of a 3-point scale described in Section 3 w as used to perform risk identification and risk ranking of this bridge.The details are not displayed in this paper.The results show n in Tables 3-5 present the w eight vectors and ranking of risk factors.It can be seen from Tables 3-5 that 1) anchor construction risk is the most important risk factor in risk group B,quality risk is the most important risk factor in risk group C,and drainage measures has the highest priority value in group D;2) the 3-point scale in the adopted FAHP method is practicaltocompletethecomprehensiverisk identification and ranking of bridges during construction.
图表编号 | XD0033326200 严禁用于非法目的 |
---|---|
绘制时间 | 2019.02.01 |
作者 | Jin Cheng、Mingsai Xu、Zhengrong Chen |
绘制单位 | State Key Laboratory for Disaster Reduction in Civil Engineering,Tongji University、Department of Bridge Engineering,Tongji University、Department of Bridge Engineering,Tongji University、Department of Bridge Engineering,Tongji University |
更多格式 | 高清、无水印(增值服务) |
查看“Table 5We ight ve ctors and ranking of pairwise comparison matrixe s for risk group D base d on the propose d me thod”的人还看了
- 表3 全球冰川面积分级统计Table 3Statistics of number and area of glaciers in different area ranks all around the w orld
- 表4 一级冰川区内不同面积等级冰川的数量与面积Table 4 Number and area of glaciers in different area ranks of the 19 first-order glacier regions
- 表5 安徽省16个地级市公因子及综合得分与排名Table 5 Common factor and comprehensive scoring and ranking of 16 cities in Anhui Province