《Table 2 List of sixteen 1∶50 000 geological maps of western Henan completed from 2013 to 2016》

《Table 2 List of sixteen 1∶50 000 geological maps of western Henan completed from 2013 to 2016》   提示:宽带有限、当前游客访问压缩模式
本系列图表出处文件名:随高清版一同展现
《晋南–豫西地区1:500000数字地质图空间数据库》


  1. 获取 高清版本忘记账户?点击这里登录
  1. 下载图表忘记账户?点击这里登录

In terms of data quality control,a complete work log table was established.Each operator had to fill in the work log as required on a daily basis and fully record the daily work,which was then approved and signed by the operation team leader.A complete self-examination and mutual inspection form was created.Each operator carried out 100%self-examination when creating a map,and truthfully and fully recorded the results of the self-examination and revision,which was then approved and signed by the operation leader.With regards to selfexamination,the person in charge of the project had to organize mutual inspections among other operators with an inspection rate of 60%or above.The results of mutual inspection and revision had to be truthfully recorded,and then approved and signed by the operation leader.After each map was completed,10%of it was sampled for project inspection,while ensuring that all the inspection contents met relevant quality requirements.