PARTⅠ DRIFT AND CHAMBER3
Chapter 1 Rock Drift3
1.1 Cross Section Design3
1.2 Drilling and Blasting21
1.3 Mucking35
1.4 Supporting52
1.5 Ventilation and Dust Suppression74
1.6 Construction Methods for Tunnelling in Loose and Crushed Rocks76
1.7 Tunnel Boring Machine78
1.8 Tunnelling Methods & Organization and Management of Drift Crew81
Chapter 2 Pit Bottom and Chamber87
2.1 Structure and Type of Pit Bottom87
2.2 Design of Major Chambers in Shaft Inset92
2.3 Chamber Construction108
2.4 Drift Crossing Design123
2.5 Crossing Construction131
Chapter 3 Drifts in Mining District137
3.1 Method of Orientation for Development Drifting in Mining District138
3.2 Coal Heading Construction141
3.3 Alternate Heading Construction152
3.4 Rise and Dip Construction154
Chapter 4 Inclined Shaft158
4.1 Structure of Inclined Shaft158
4.2 Construction of Inclined Shaft182
5.1 Introduction201
Chapter 5 Vertical Shaft Design201
PARTⅡ VERTICAL SHAFT201
5.2 Rigid Equipment of Shaft204
5.3 Flexible Equipment of Shaft213
5.4 Arrangement of Shaft Section218
5.5 Design of Shaft Section229
5.6 Shaft Collar and Shaft Sump237
Chapter 6 Shaft Sinking248
6.1 Sinking Through Surface Ground248
6.2 Drilling and Blasting263
6.3 Mucking277
6.4 Shaft Lining295
6.5 Control of Falling Water in Shaft317
6.6 Other Auxiliary Works332
6.7 Shaft Installation338
6.8 Construction Scheme and Organization345
6.9 Arrangement of Shaft Sinking Equipment363
6.10 The Technical Development of Shaft Sinking Method379
7.1 Sinking Headframe388
Chapter 7 Shaft Sinking Structures388
7.2 Working Platforms for shaft Sinking410
7.3 Forms for Walling the Shaft423
Chapter 8 Deepening of Vertical Shaft432
8.1 Introduction432
8.2 Protective Facilities for Shaft Deepening435
8.3 Shaft Deepening by Using An Auxiliary Level446
8.4 Shaft Deepening with A Deepening Compartment453
8.5 Shaft Deepening by A Conventional Raise456
8.6 Raise Driving with A Suspended Cage461
8.7 Other Shaft Deepening Methods467
8.8 Selection of Shaft Deepening Schemes469
PARTⅢ LABOR ORGANIZATION AND MANAGEMENT IN MINE CONSTRUCTION477
Chapter 9 Preparations of Mine Construction477
9.1 Contents of Preparation for Construction478
9.2 General Working Plan of the Surface Shaft-site481
9.3 Major Approaches for Shortening the Preparation Period483
10.1 Mining Engineering Scheme and Sequence of Shaft Sinking489
Chapter 10 Sequence of Shaft-sinking and Drifting489
10.2 Modification Work in the Transitional Period fromShaft Sinking into Roadway Drifting493
10.3 Sequence for Developing Shaft Station and Chambers503
10.4 Arrangement of Roadway Drifting in Mining Sections505
Chapter 11 Management of Mine Construction506
11.1 Drawing up Design of Working Organization506
11.2 Technical Management510
11.3 Project Management513
1991《井巷设计与施工》由于是年代较久的资料都绝版了,几乎不可能购买到实物。如果大家为了学习确实需要,可向博主求助其电子版PDF文件(由董方庭等主编 1991 徐州:中国矿业大学出版社 出版的版本) 。对合法合规的求助,我会当即受理并将下载地址发送给你。
高度相关资料
- 井巷喷射混凝土施工
- 1976 北京:煤炭工业出版社
- 井巷工程
- 焦作工学院
- 井巷工程施工手册 第11篇 立井井筒施工 第12篇 平、斜巷道施工
- 1979 北京:煤炭工业出版社
- 井巷工程 第6分册 建井施工组织与管理
- 1982 北京:煤炭工业出版社
- 井巷设计基础
- 1990 徐州:中国矿业大学出版社
- 井巷施工与计算示例
- 1994 北京:煤炭工业出版社
- 井巷特殊施工设计与计算
- 1994 徐州:中国矿业大学出版社
- 井巷工程
- 1991 北京:化学工业出版社
- 井巷工程
- 1984 北京:煤炭工业出版社
- 井巷工程施工手册 第3篇 井巷工程施工组织与管理
- 1979 北京:煤炭工业出版社
- 工业企业管道运输
- 1992 北京:煤炭工业出版社
- 供水管井设计与施工 增订版
- 1964 北京:中国建筑工业出版社
- 价格管理实务
- 1990 长春:吉林大学出版社
- 起重搬运机械安全技术
- 1991 北京:中国物资出版社
- 矿井施工组织设计
- 1983 北京:煤炭工业出版社