《Table 3 Removal rate of total Cd and energy consumption after electro-kinetic remediation》
提示:宽带有限、当前游客访问压缩模式
本系列图表出处文件名:随高清版一同展现
《Study on Electrokinetic Remediation of Cadmium-contaminated Soil》
The total Cd removal rates and energy consumption of the various groups are shown in Table 3.It could be seen that the energy consumption became larger over time.With the remediation time prolonged from 72 to 96 h,the removal rate of total Cd increased by 6.68%.With the remediation time prolonged from 96 to 120 h,the removal rate of total Cd increased by 8.75%,while when the remediation time was prolonged to 144 h,the removal rate of total Cd only increased by 1.07%.Therefore,comprehensively,the optimal remediation time was 120 h.
图表编号 | XD0028001000 严禁用于非法目的 |
---|---|
绘制时间 | 2019.02.01 |
作者 | Meng SHEN、Yanqiu CHEN、Hui HAN、Xin WEN、Min SHAO、Mingxin WANG、Yushan WAN |
绘制单位 | College of Environment and Safety Engineering,Changzhou University、College of Environment and Safety Engineering,Changzhou University、College of Environment and Safety Engineering,Changzhou University、College of Environment and Safety Engineering,Changzho |
更多格式 | 高清、无水印(增值服务) |
查看“Table 3 Removal rate of total Cd and energy consumption after electro-kinetic remediation”的人还看了
- Table 3 Comparison of total inhibitory rates after BPDC treatment under different concentrations in HepG-2 cells