《Tab.6 The parameters of 1MW turboexpander》
提示:宽带有限、当前游客访问压缩模式
本系列图表出处文件名:随高清版一同展现
《从天然气到核能:主动磁悬浮轴承系统的多种应用(英文)》
A series of turbo-expander units was supplied in 1993for ethylene service(Figure 8).The payback period compared to fluid film bearings was three months due to the elimination of the contamination of the heat exchangers and of the associated requirement for decontamination(requiring plant shutdown).Following a recent controls upgrade,the AMB units are still operational.More recent turbo-expander experience is described by Jayawant and Shokraneh(2016)[14].An overview specification for this unit is given below:
图表编号 | XD0017591100 严禁用于非法目的 |
---|---|
绘制时间 | 2018.08.26 |
作者 | Richard Jayawant |
绘制单位 | Waukesha Magnetic Bearings |
更多格式 | 高清、无水印(增值服务) |