《Table 1Ten SCFLs with a BIT combination.》

《Table 1Ten SCFLs with a BIT combination.》   提示:宽带有限、当前游客访问压缩模式
本系列图表出处文件名:随高清版一同展现
《桥岛隧组合跨海通道的最新建设技术》


  1. 获取 高清版本忘记账户?点击这里登录
  1. 下载图表忘记账户?点击这里登录

Although these eight BIT combination projects include only two suspension bridges,major contributions have been made to bridge construction technology by the development of sea-crossing suspension bridges with long spans.The western section of the San Francisco–Oakland Bay Bridge contains two single main-span suspension bridge units with 701 m spans—the second longest at that time.These units were built and then connected by means of a central shared anchor block,as shown in Fig.2(a),which was an excellent method at that time of maintaining the balance in terms of mechanics while reducing the costs[4].Further progress in suspension bridges led to the development of a multiple main-span suspension bridge,which is a suspension bridge with two side spans,several main spans,and only two anchors on both ends;there is no additional anchor anywhere,as shown in Fig.2(b)[9].The other contribution of suspension bridge technology is the creation of a new world record in span length:The box girder suspension bridge in the Great Belt Fixed Link is 1624 m in length,and is further characterized by wind-resistance technology for flutter and VIV control with corner deflectors[10].