《Table 3 Key points of the integration of survey and design.》
(3)Temporary projects should be included in inspection and evaluation at all levels of the construction process,especially in safety inspection.Temporary projects,construction sites,and tunnel projects should be taken as key areas and should not be neglected due to their remote location or small scale in order to achieve full coverage.